Project Period |
| |
| |
2003.10.9 - 2004.6.22 |
| |
| |
Project Overview |
| |
|
| |
Replacement of the MMI(Man-Machine Interface) system including server and operator stations of ABB
Procontrol P13/42 DCS for Bundang CCPP to new MMI system on the basis of ARIDES(Advanced Real-time
Information DEployment System) development platform |
| |
|
| |
Project Outcomes |
| |
|
| |
* Proofing of system reliability through more than one year stable operation
* Reduction of upgrade investment cost
* Improvement of expandability and maintainability of the system
* Increase of plant availablity |
| |
|
| |
The necessity of the business |
| |
|
| |
* The existing computer system for process control established by Korea South East Power Co. in the central control room
of Combined Cycle Power Plant Bundang is a core facility that checks and operates the operation condition of the whole
facility in running the power plant. It is ABB Procontrol P13/42 DCS, block #1 is a PRAUT system built in 1992 and block
#2 is a PMS system built in 1997. But, it was necessary to improve the system due to the difficulties of repairs and
maintenances, the deterioration of capacity and the limit of function, as the facility is getting aged. Thus, Korea South East
Power Co. pushed ahead with the international bid and BNF Technology received an order in the competition with
promising foreign venders based on the distinguished technique and price competition. The reduction of facility
investment cost and the freedom from technology governance to autonomy through this business have a great ripple
effect to the power plant business in general with the successful business performance. |
| |
|
| |
Specification of the system |
| |
|
| |
Specification of the system
|
Technology specification
|
ABB Procontrol(PRAUT) |
System structure
|
Limited server-client structure
|
server-client structure |
| Communication Interface |
PPS Dr. Seufert Interface Board |
G3 Interface Card |
| Control device |
Keyboard/ Hardwired |
Mouse/network |
| server |
BUL DPS 200 |
ftServer2.4 GHz Xeon |
| Operation system |
GECOS HVS6 |
Window 2003, XP |
| CPU capacity |
4MB-8MB |
1 GB |
| Hard disc capacity |
300MB |
73 GB |
| Past data storage capacity |
5days |
limitless |
| Real time trend |
Period of scan - 2sec
Maximum span - 2 hour |
Period of scan - 10 msec
Maximum span - limitless |
Data backup |
tape |
CD |
| Other operation function |
N/A |
- Point Search
- Tag Detail Information
- Output Command Display |
|
| |
|
 |
| |
|
| |
Project Period |
| |
|
| |
2005.4.20 - 2005.12.20 |
| |
|
| |
Project Overview |
| |
|
| |
Replacement of the OPS(Operator Interface system) including server and operator stations of MHI MIDAS-
8000 DCS for Buchun CHPP to new MMI system on the basis of BNF own ARIDES(Advanced Real-time
Information DEployment System) development platform |
| |
|
| |
Project Outcomes |
| |
|
| |
* Newly developed computer system will be applied step by step by 2006.
* Reduction of upgrade investment cost
* Adoption of a state of the Arts computer technologies
* Improvement of expandability and maintainability of the system following the use of the latest hardware
and
operating system
* Customizing of various user requirements |
| |
|
| |
The necessity of the business |
| |
|
| |
Computer system for process control built in 1992 in the central control room of GS Power Co. Bucheon combined heat
and power plant was MIDAS-8000 of Japan¡¯s Mitsubishi Heavy Industries. It is the core facility that checks and operates
the whole operation condition in running the power plant. But, as the system are getting aged, the initialization due to
the malfunction of them were so frequent and the difficulty of repairing and maintaining due to the production stoppage
of spare parts, especially due to the limit of the facility function, it is difficult to gain the operation data fit for the user¡¯s
additional requirement. In solving this problem, it is possible to upgrade it to the latest version of Mitsubishi Heavy
Industries with the excessive investment cost. Thus, we reviewed the technology in multi angles and we judged that we
can upgrade it with our own technology. Then we started to develop new computerization system by using the BNF
Technology developed ARIDES (Realtime Information DEployment System) development platform. |
| |
|
| |
Specification of the system |
| |
|
| |
Specification of the system
|
Technology specification
|
ABB Procontrol(PRAUT) |
System structure
|
Limited server-client structure
|
server-client structure |
| Communication Interface |
Ethernet + its own protocol |
Ethernet + TCP/IP |
| Control device |
Special Function Keyboard |
Standard Mouse/keyboard |
| server |
Fujitsu Astation-240 |
HP DL580 3.33 GHz Xeon |
| Operation system |
SA/X Unix |
Redhat AS v4 Linux |
| CPU capacity |
16M |
2 GB |
| Hard disc capacity |
384MB |
300 GB RAID |
| Past data storage capacity |
30 days(180 point) |
limitless |
| Real time trend |
Period of scan - 10sec
Maximum span - 2 hour |
Period of scan - 100 msec
Maximum span - limitless |
Data backup |
tape |
CD |
Other operation function |
|
- Point Search/ Viewer
- Point Configurator
- X-Y Plot
- Composed Point Builder |
|
| |
|